Aged Care Flooring Project- Perth Renovation
Carinya of Bicton

FloorVision completed a full aged care flooring renovation at Carinya of Bicton in Perth.

The project included commercial vinyl flooring, wall vinyl, carpet tiles, extensive floor preparation and moisture remediation to meet healthcare standards.

  • Project specific Mapei floor & wall preparation system created

  • Gerflor ​​commercial vinyl flooring 

  • Gerflor wall vinyl 

  • Interface carpet tiles, with Mediseal

  • Moisture remediation systems

  • Full floor preparation & levelling

  • Engineered falls to waste

Sector: Aged Care / Healthcare
Location: Bicton, Perth WA
Area: Approx: 1100m²

Project Summary

Carinya of Bicton in Perth presented significant technical challenges due to decades of renovations and widespread moisture issues throughout the facility. Existing bathroom tiles were deteriorated, floor levels varied significantly between rooms, and falls to waste were unsafe for residents.

FloorVision completed extensive floor & wall preparation works across approximately 1100m² of space. Working closely with Mapei technical specialists, a project-specific moisture remediation and substrate preparation system was developed to protect the new commercial vinyl and wall installations.

Bathroom areas required full preparation over existing ceramics, including diamond grinding, void repairs, vapour barriers, engineered falls to waste and complete waterproofing systems. Gerflor full-height wall and floor vinyl was then installed to create sealed, compliant healthcare bathrooms with safe gradients.

In the main thoroughfare areas, significant bulk fill levelling compounds were used to correct floor inconsistencies, and concrete transition ramps were installed at all height changes to ensure safe resident movement.

The project was completed with coved commercial vinyl to service areas and Interface carpet tiles to the main spaces. Delivering a durable and compliant commercial flooring solution for the aged care facility.​

Technical Floor & Wall Preparation System

Due to significant moisture issues and deteriorated substrates, a project specific remediation system was developed in consultation with Mapei technical representatives.

Substrate Preparation

  • Removal of loose ceramic tiles

  • Diamond grinding of existing tiled surfaces

  • Identification and repair of large voids using Nivorapid with added sand

  • Full surface cleaning prior to system application

Bathroom Floor System

  • Planiseal MR vapour barrier

  • Quartz sand seeding

  • Engineered falls to waste using Nivorapid with added sand

  • Primer T

  • Bond breaker (Mapeflex MS45)

  • Mapelastic Aquadefense Zero moisture barrier

  • Planiprep SC skim coating

  • Adesilex G19 adhesive

  • Installation of Gerflor full-height wall and floor vinyl

Wall Preparation System

  • Eco Prim Grip

  • Planiprep SC skim coating

  • Mapelastic Aquadefense Zero moisture barrier

  • Primer T

  • Planiprep SC skim coating

  • V4 Evolution adhesive

Main Thoroughfare Areas

  • Bulk fill levelling compounds to correct floor height inconsistencies

  • Concrete ramps installed at all level transitions

  • Coved commercial vinyl to service areas

  • Mediseal coating to thoroughfare zones

  • Interface carpet tiles installation

Central Wet Areas- Engineered Screed System

(Laundries, Cleaners Rooms & Service Areas)

  • Installation of Mapei engineered screed system

  • Engineered gradients and substrate correction

  • Moisture management and system integration

  • Preparation for coved commercial vinyl installation